Tuesday, November 11, 2008

Package 2 : Presentation of Architecture and Medical proposal

The process of design a few discussions and presentations between the Main contractor and JKR's representative and KKM. On the date of 7th July 2008 :

The major changes :
1. To review of no of carparks - the total of carparks should be the no of new building requirement plus the no of carpark replacement on the existing area.
2. To make it same level between exixting OT room to the new OT room and should be link with corridors.
3. To provide bigger medical storage area for the whole Hospital operation. (Main medical record storage area ).
4. Reshuffle the clinical and surgical area.
5. Mechanical and Electrical to review and to reconsider the existing services.

PACKAGE 2 : NEW BUILDING PRE-BID DOCUMNETS

The Tender document collected at JKR office on 23 July 2008. Consist 6 Volumes:
Volume 1 : Contract and genereal requirement
Volume 2 : Architecture and Medical brief
Volume 3 : Civil works
Volume 4 : Structural Works
Volume 5 : Mechanical Works
Volume 6 : Electrical Works

The proposal should be submitted on 23 Sept 2008.